The World Bank
Tunnel
Project Overview
The International Monetary Fund (IMF) World Bank Tunnel required comprehensive restoration to improve both durability and appearance while minimizing disruption to daily operations. JMJ General Restoration completed the work during overnight hours, performing expansion joint replacement, structural concrete repairs, rust remediation, commercial painting, and installation of a high-performance waterproof traffic coating system. The result was a clean, durable tunnel designed to withstand heavy pedestrian traffic and extend the service life of the facility
Project Scope
Replacement of deteriorated aluminum expansion joint cover
Concrete repairs surrounding the expansion joint system
Surface preparation including cleaning, scraping, and rust removal
Commercial painting of tunnel ceilings, walls, exposed piping, and metal surfaces
Application of industrial primer and semi-gloss protective coating system
Rust remediation using a multi-coat protective paint system
Installation of Tremco Vulkem waterproof traffic coating system
Overnight work scheduling to minimize disruption to facility operations
Complete site cleanup and debris removal upon completion