555 mASS AVE INTERIOR RESTORATION
555 Mass Ave Condos
The 555 Massachusetts Avenue Condominium interior renovation transformed the building's common areas with a complete modernization of the lobby, elevator lobbies, corridors, and penthouse level. JMJ General Restoration performed extensive demolition, surface preparation, painting, flooring replacement, restroom renovations, lighting upgrades, and architectural finish installations throughout the occupied high-rise. Careful coordination, attention to detail, and phased construction allowed the project to be completed while minimizing disruption to residents and building operations.
Scope of Work
Complete renovation of the first-floor lobby and common areas
Full corridor and elevator lobby restoration on Floors 2–14
Penthouse corridor and restroom renovations
Interior demolition and surface preparation
Drywall repairs, priming, and painting of walls, ceilings, doors, trim, and baseboards
Installation of new carpet and porcelain tile flooring
Elevator lobby tile installation with Schluter edge systems
Installation of new restroom wall and floor tile
Installation of new ADA-compliant restroom fixtures and accessories
Installation and replacement of decorative lighting fixtures
Wallpaper installation in elevator lobbies
Painting and refinishing of elevator doors and architectural columns
Installation of owner-provided signage throughout the building
Final detailing, caulking, and project cleanup